project F:Realisation-c

From student
Jump to: navigation, search

Home

Design    Realisation    Relationships

Design Execution    Prototype Validation    Arduino development    1:1 Prototype   


Technical implementation

The overall design construction is based on the wooden ribs of the structure, stabilized by wooden cross beams to which the cushions will be connected. The frames are fixed on two concrete bases to allow it to 'float' just above the park. As it's a standard frame mass customized, a Grasshopper plugin to Rhino can automatically generate these frames from the powerlines in the model.


Dstruct.jpg Lasercutt.jpg 3D frame setup and alignment, lasercut drawing for model of all the frames

Timeline


The planning is set in four stages which partially merge at the beginning and end. This way we can always keep going.

In this third stage, we don't have to re-invent the wheel. It is an existing technology that we wish to implement in a new way. The whole design needs to finalized in order to focus in on the extend of the 1:1 prototype. After having contacted Buitink Technologies already in phase 2, it could be a good option to contact Rink de Vries, who is their specialist on cushion technologies.

Then we need to be the research and development team to draw up the prototype, develop the pattern, write the Arduino code, calculate the required materials and build it.



P7 construction planning.jpg


Materials and Equipment list

111205 Material table mod.jpg