project C:REALIZATION PLAN
(→MATERIAL LIST for FABRICATION) |
(→MATERIAL LIST for FABRICATION) |
||
Line 120: | Line 120: | ||
[[File:1 to 1 frabrication material list.jpg |410px|right]] | [[File:1 to 1 frabrication material list.jpg |410px|right]] | ||
− | |||
− | |||
− | |||
===<span style="color:orange">REALIZATION TIMELINE</span>=== | ===<span style="color:orange">REALIZATION TIMELINE</span>=== |
Revision as of 23:05, 28 November 2011
Contents |
REALIZATION PLAN
TECHNICAL IMPLEMENTATION
The architectural fabrication consists of 4 major aspects:
Inflatable Structures:
- application of bike tube materials to increase the strength of inflatables
- application of valve for better performance of maintain air pressure
- application of outer skin for protection of inflatables
- application of composite materials as inflatables frame
Air Pump System:
- Application of PVC tube for even distribution of air pressure
- Application of electrical pumping system
- Application of compressor to accurate air pressure supply
Pulley System:
- Application of pulley for flexible changing of stings profile
- Application of pulley motor support the pulley system
Control System:
Strip concept
Path system concept
The path system manages the path infrastructure on the site. It creates short-cuts through the site to the other surroundings and allows access to the activities in the site. The system has the following functionality:
- check if new activity is connected to a path
- if not then create a new path on the right patch of new activity
- if two activities are linking then merge activities and move path to the right of the rightmost activity
Path system logic scheme
Path system diagrams
Arch concept
The arch shape is determined by a relation between the length of the space and the preferred height.
VALIDATORS
Future Users
Future Owner
drs Ronald Kuil TU Delft Facility Management