atom09:Analysis
From student
(Difference between revisions)
Line 12: | Line 12: | ||
Here [[atom09:Neighbourhood Facilities|Neighbourhood Facilities]] | Here [[atom09:Neighbourhood Facilities|Neighbourhood Facilities]] | ||
− | |||
− | |||
Line 19: | Line 17: | ||
Here [[atom09:Green|Green]] | Here [[atom09:Green|Green]] | ||
− | |||
Line 25: | Line 22: | ||
Here [[atom09:Water|Water]] | Here [[atom09:Water|Water]] | ||
− | |||
Line 36: | Line 32: | ||
Here [[atom09:Conclusions|Conclusions]] | Here [[atom09:Conclusions|Conclusions]] | ||
− | |||
Revision as of 16:04, 14 September 2011
Contents |
01 Interview
At this page you can find all the reports of the interviews.
02 Traffic Flow
We analysed the traffic flow, because the site is situated between two very important one-way roads.
03 Neighbourhood Facilities
04 Green
Here Green
05 Water
Here Water
06 Transportation
Here Transportation
07 Conclusions
Here Conclusions
08 Sketches
Here Sketches