atom10:Process

From student
(Difference between revisions)
Jump to: navigation, search
Line 4: Line 4:
  
 
<gallery widths="100" heights="150" perrow="6" >
 
<gallery widths="100" heights="150" perrow="6" >
File:An1.jpg|'''Cross-programming'''
+
File:An1.jpg|Dialogue between space and context
File:An2.jpg|'''Trans-programming'''
+
File:An2.jpg|Links to diggerent programmes and activities
File:An3.jpg|'''Dis-programming'''
+
File:An3.jpg|Dialogue between constant-transformation
File:An4.jpg|'''Cross-programming'''
+
File:An4.jpg|Gradients of people
File:An5.jpg|'''Trans-programming'''
+
File:An5.jpg|Movements and flows trajectories
File:An6.jpg|'''Dis-programming'''
+
File:An6.jpg|Dialogue between space and culture
 
</gallery>
 
</gallery>
  
Line 21: Line 21:
 
==Method==
 
==Method==
 
   
 
   
<gallery widths="200" heights="150" perrow="3" >
+
<gallery widths="200" heights="100" perrow="3" >
 
File:1cross.jpg|'''Cross-programming''' - Gives an old building/space a new function or programme not intended for it.
 
File:1cross.jpg|'''Cross-programming''' - Gives an old building/space a new function or programme not intended for it.
 
File:2trans.jpg|'''Trans-programming''' - Places two programmes that are not normally associated with each other together.
 
File:2trans.jpg|'''Trans-programming''' - Places two programmes that are not normally associated with each other together.

Revision as of 09:45, 10 October 2011

Contents

Future scenario


It seems logical to consider the future requirements of the site as part of the existing context. With the global population set to exceed 7 billion this year, there will be increasing pressure on the current housing stock. Regulations stipulate that a strategy must be created to adapt the urban infrastructure as a pre-requisite for future housing development. In this way, the intervention can precipitate the future scenario by beginning to implement the sites requirements in a local and on the larger scale. It seems that the implementation of infrastructure and housing have been discussed, but so far there has been little thought into how and what auxiliary and interstitial activities should be provided. Our intervention can begin to provide these activities and form a framework which develops in conjunction with new infrastructure developments.

Process

Procnew.jpg

Method




Personal tools
Namespaces
Variants
Actions
Projects
Atoms
Toolbox