project C:ARCHITECTURE

From student
(Difference between revisions)
Jump to: navigation, search
(ARCHITECTURE DESIGN)
 
(44 intermediate revisions by 3 users not shown)
Line 1: Line 1:
 +
__NOTOC__
 +
[[Project C:Home|go back to project page >>]]
 
<div style="float: left; width: 1200px; margin-right:10px; text-align:left">
 
<div style="float: left; width: 1200px; margin-right:10px; text-align:left">
  
 
=<span style="color:orange">ARCHITECTURE</span>=
 
=<span style="color:orange">ARCHITECTURE</span>=
 
<div style="float: left; width: 380px; margin-right:30px; text-align:justify">
 
<div style="float: left; width: 380px; margin-right:30px; text-align:justify">
===CONCEPT===
+
 
 +
===<span style="color:orange">CONCEPT</span>===
  
 
[[file:site01.gif|380px]]
 
[[file:site01.gif|380px]]
  
====Strip concept====
+
<gallery widths="82" heights="50" perrow="3" >
  
  
<gallery widths="145" heights="90" perrow="2" >
+
File:concept01-2.jpg | Transition
 +
File:concept02-2.jpg | Orientation
 +
File:concept03-2.jpg | Stripe mechanism
 +
</gallery>
  
File:site-new.jpg
 
File:sketch02.jpg
 
  
</gallery>
+
The architectural concept has the following lines of action:
 +
 
 +
'''ORIENTATION:'''
 +
 
 +
- the activities are oriented towards the inner site for protection against traffic noise
 +
 
 +
- the strips follow this line of orientation for structural feasibility - the arches span the width of the site
 +
 
 +
'''CONNECTIONS:'''
 +
 
 +
- the placement of the strips was determined by the main movement lines in the site and shortcuts - from BK-City to Science Center
 +
 
 +
- the structure extends towards the northern border to form a pedestrian bridge that connects the site and BK-City to the Science Center and Botanical Gardens
 +
 
 +
'''TRANSITIONS: '''
 +
 
 +
-the structure is set back from the main street-line to create a porous border of vegetation that protects against noise traffic and creates a transitional zone between the street pavement and the site
 +
 
 +
 
 +
====Strip concept====
  
<gallery widths="145" heights="90" perrow="2" >
 
  
File:sketch01.jpg
 
File:sketch03.jpg
 
  
</gallery>
 
  
 
====Path system concept====
 
====Path system concept====
Line 42: Line 61:
 
Path system diagrams
 
Path system diagrams
  
<gallery widths="80" heights="00" perrow="3" >
+
<gallery widths="80" heights="50" perrow="3" >
  
 
file:path_1.jpg|
 
file:path_1.jpg|
Line 50: Line 69:
 
</gallery>
 
</gallery>
  
<gallery widths="80" heights="00" perrow="3" >
+
<gallery widths="80" heights="50" perrow="3" >
  
 
file:path_4.jpg
 
file:path_4.jpg
Line 58: Line 77:
 
</gallery>
 
</gallery>
  
 +
====Arch concept====
  
===Validators===
+
The arch shape is determined by a relation between the length of the space and the preferred height.
  
[[Project C:TU Delft drs Kuil |drs Ronald Kuil TU Delft Facility Management]]
+
<gallery widths="80" heights="50" perrow="3" >
  
</div>
+
file:arch_1.jpg
 +
file:arch_2.jpg
 +
file:arch_3.jpg
  
<div style="float: left; width: 780px; margin-right:10px; text-align:justify">
+
</gallery>
  
===Design Proposal===
+
===<span style="color:orange">VALIDATORS</span>===
  
<div style="float: left; width: 780px; margin-right:10px; text-align:justify">
+
====User case scenarios====
  
'''<span style="color:orange">Architectural proposal</span>'''
+
[[Project C:User Scenarios |User Scenarios]] for many different people with many different hobbies.
  
 +
====Location owner====
  
 +
[[Project C:TU Delft drs Kuil |'''drs Ronald Kuil''']], TU Delft Facility Management:<br>
 +
''Spacebooks concept is in line with the ambitions of the university. Making Spacebook the direct link between the surrounding buildings, TU Delft sees a lot of potential in the location.''
  
The architectural implementation of the structure follows a set of rules, they can be found in the pictures below.
+
'''Caspar vd Zanden''', Architecture student:
 +
''Extremely cool!''
  
Part of the original '''<span style="color:orange">vegetation</span>''' of the site is maintained. Not only to create a border between the heavy traffic surrounding the site, but also to create a transition zone between the activities and structure and the direct environment. The lower bushes and the high trees are kept to create this transition border. The lower bushes make sure the structure is visible from the outside and the site looks accessible. The high trees give the the border more body and ultimately define the shape of the plan of the structure.
+
</div>
  
The structure system itself creates '''<span style="color:orange">pathways</span>''' next to spaces, see technical implementation. Even without these automatically created pathways the site is still accessible. Four entrances/exits are created in the border: two leading to the faculty of architecture, one leading to the Science Centre and one leading to the Botanical Gardens of TU Delft. Situated between the green border and the structure is a small pathway that can be followed all around the site. This ensures the site is always accessible in the best way possible.
+
<div style="float: left; width: 780px; margin-right:10px; text-align:justify">
  
The '''<span style="color:orange">strips</span>''' of the construction are continued in the green border. This creates an interesting transition zone and the entire site (structure, vegetation and pathways) work as one organism. To strengthen the idea of one organism the architectonic detailing of the strips (the structural strips, the footpath and the vegetation) is crucial. This architectonic detailing is for example LED lighting in the upper and under surface of the construction, to give the structure its linear shape, also when it's dark. The used materials in the vegetation, pathways and construction surface are chosen to enlarge the feeling of linearity, continuity and one organism.
+
===<span style="color:orange">ARCHITECTURE DESIGN</span>===
<gallery widths="151" heights="98" perrow="4" >
+
  
 +
[[File:siteplan-final3.jpg|760px|left]]
  
 +
Site plan - connections to the Science Center and the Botanical Gardens
  
 +
[[File:birdie.jpg|760px|left]]
  
</gallery>
+
Bird's eye view render
  
  
</div>
+
[[File:facade_it_1.png|760px|left]]
  
<div style="float: left; width: 780px; margin-right:20px; text-align:justify">
+
South Elevation - iteration n
  
'''<span style="color:orange">Technical implementation</span>'''
+
[[File:facade_it_3.png|760px|left]]
  
 +
South Elevation - iteration n+1
  
[[File:curves2.jpg|380px|left]]
 
  
 +
[[File:science.jpg|760px|left]]
  
 +
Connection to Science Center render
  
  
 +
[[File:interior.jpg|760px|left]]
  
The possible '''<span style="color:orange">curves</span>''' are predefined by the system. They are determined by a relation between the length of the space and the preferred height.
+
Interplay of activities render
 +
 
 +
 
 +
</div>
 +
</div>
 +
 
 +
 
 +
 
 +
<div style="float: left; width: 1200px; margin-right:10px; text-align:left">
 +
[[Project C:Home|go back to project page >>]]
 +
</div>

Latest revision as of 20:01, 30 November 2011

go back to project page >>

ARCHITECTURE

CONCEPT

Site01.gif


The architectural concept has the following lines of action:

ORIENTATION:

- the activities are oriented towards the inner site for protection against traffic noise

- the strips follow this line of orientation for structural feasibility - the arches span the width of the site

CONNECTIONS:

- the placement of the strips was determined by the main movement lines in the site and shortcuts - from BK-City to Science Center

- the structure extends towards the northern border to form a pedestrian bridge that connects the site and BK-City to the Science Center and Botanical Gardens

TRANSITIONS:

-the structure is set back from the main street-line to create a porous border of vegetation that protects against noise traffic and creates a transitional zone between the street pavement and the site


Strip concept

Path system concept

The path system manages the path infrastructure on the site. It creates short-cuts through the site to the other surroundings and allows access to the activities in the site. The system has the following functionality:

- check if new activity is connected to a path

- if not then create a new path on the right patch of new activity

- if two activities are linking then merge activities and move path to the right of the rightmost activity


Path system logic scheme

Path chart.png


Path system diagrams

Arch concept

The arch shape is determined by a relation between the length of the space and the preferred height.

VALIDATORS

User case scenarios

User Scenarios for many different people with many different hobbies.

Location owner

drs Ronald Kuil, TU Delft Facility Management:
Spacebooks concept is in line with the ambitions of the university. Making Spacebook the direct link between the surrounding buildings, TU Delft sees a lot of potential in the location.

Caspar vd Zanden, Architecture student: Extremely cool!

ARCHITECTURE DESIGN

Siteplan-final3.jpg

Site plan - connections to the Science Center and the Botanical Gardens

Birdie.jpg

Bird's eye view render


Facade it 1.png

South Elevation - iteration n

Facade it 3.png

South Elevation - iteration n+1


Science.jpg

Connection to Science Center render


Interior.jpg

Interplay of activities render



go back to project page >>

Personal tools
Namespaces
Variants
Actions
Projects
Atoms
Toolbox