project C:REALIZATION PLAN

From student
(Difference between revisions)
Jump to: navigation, search
(TECHNICAL IMPLEMENTATION)
(TECHNICAL IMPLEMENTATION)
Line 20: Line 20:
 
'''Air Pump System:'''
 
'''Air Pump System:'''
  
- the placement of the strips was determined by the main movement lines in the site and shortcuts - from BK-City to Science Center
+
- Application of PVC tube for even distribution of air pressure
  
- the structure extends towards the northern border to form a pedestrian bridge that connects the site and BK-City to the Science Center and Botanical Gardens
+
- Application of electrical pumping system
  
 +
- Application of compressor to accurate air pressure supply
 
'''Pulley System: '''
 
'''Pulley System: '''
  
-the structure is set back from the main street-line to create a porous border of vegetation that protects against noise traffic and creates a transitional zone between the street pavement and the site
+
- Application of pulley for flexible changing of stings profile
 +
 
 +
- Application of pulley motor support the pulley system
  
 
'''Control System: '''
 
'''Control System: '''

Revision as of 21:16, 28 November 2011

Contents

REALIZATION PLAN

TECHNICAL IMPLEMENTATION

The architectural fabrication consists of 4 major aspects:

Inflatable Structures:

- application of bike tube materials to increase the strength of inflatables

- application of valve for better performance of maintain air pressure

- application of outer skin for protection of inflatables

- application of composite materials as inflatables frame

Air Pump System:

- Application of PVC tube for even distribution of air pressure

- Application of electrical pumping system

- Application of compressor to accurate air pressure supply Pulley System:

- Application of pulley for flexible changing of stings profile

- Application of pulley motor support the pulley system

Control System:


Strip concept


Path system concept

The path system manages the path infrastructure on the site. It creates short-cuts through the site to the other surroundings and allows access to the activities in the site. The system has the following functionality:

- check if new activity is connected to a path

- if not then create a new path on the right patch of new activity

- if two activities are linking then merge activities and move path to the right of the rightmost activity


Path system logic scheme

Path chart.png


Path system diagrams

Arch concept

The arch shape is determined by a relation between the length of the space and the preferred height.

VALIDATORS

Future Users

read more >>

Future Owner

drs Ronald Kuil TU Delft Facility Management

Future Partners

MATERIAL LIST for FABRICATION

Material list for 1 : 5 prototypes - phase II Material list for 1 : 1 prototypes - Phase III

1 to 5 Fribication material list.jpg
1 to 1 frabrication material list.jpg
===REALIZATION TIMELINE===
Personal tools
Namespaces
Variants
Actions
Projects
Atoms
Toolbox