project C:REALIZATION PLAN
From student
(Difference between revisions)
Line 45: | Line 45: | ||
[[File:1 to 1 frabrication material list.jpg |410px|right]] | [[File:1 to 1 frabrication material list.jpg |410px|right]] | ||
− | + | <div style="float: left; width: 780px; margin-right:10px; text-align:justify"> | |
===<span style="color:orange">REALIZATION TIMELINE</span>=== | ===<span style="color:orange">REALIZATION TIMELINE</span>=== | ||
[[File:timeline.jpg |780px|left]] | [[File:timeline.jpg |780px|left]] | ||
+ | </div> | ||
</div> | </div> | ||
</div> | </div> |
Revision as of 21:59, 29 November 2011
Contents |
REALIZATION PLAN
TECHNICAL IMPLEMENTATION
The architectural fabrication consists of 4 major aspects:
Inflatable Structures:
- application of bike tube materials to increase the strength of inflatables
- application of valve for better performance of maintain air pressure
- application of outer skin for protection of inflatables
- application of composite materials as inflatables frame
Air Pump System:
- Application of PVC tube for even distribution of air pressure
- Application of electrical pumping system
- Application of compressor to accurate air pressure supply
Pulley System:
- Application of pulley for flexible changing of stings profile
- Application of pulley motor support the pulley system
Control System: