project C:REALIZATION PLAN
(→REALIZATION PLAN) |
|||
Line 10: | Line 10: | ||
The architectural fabrication consists of 4 major aspects: | The architectural fabrication consists of 4 major aspects: | ||
+ | |||
'''Inflatable Structures:''' | '''Inflatable Structures:''' | ||
− | - | + | - Application of bike tube materials to increase the strength of inflatables |
− | - | + | - Application of valve for better performance of maintain air pressure |
− | - | + | - Application of outer skin for protection of inflatables |
− | - | + | - Application of composite materials as inflatables frame |
'''Air Pump System:''' | '''Air Pump System:''' | ||
Line 27: | Line 28: | ||
- Application of electrical pumping system | - Application of electrical pumping system | ||
− | - Application of compressor | + | - Application of compressor for accurate air pressure supply |
'''Pulley System: ''' | '''Pulley System: ''' | ||
Line 36: | Line 37: | ||
'''Control System: ''' | '''Control System: ''' | ||
+ | |||
+ | |||
+ | ===<span style="color:orange">RELATION OF PROJECT</span>=== | ||
+ | |||
+ | |||
+ | '''Relation to other atom(s): ''' | ||
+ | |||
+ | |||
+ | '''Relation to other project(s): ''' | ||
+ | |||
+ | |||
+ | '''Relation to other developments on the site: ''' | ||
</div> | </div> |
Revision as of 09:53, 30 November 2011
REALIZATION PLAN
TECHNICAL IMPLEMENTATION
The architectural fabrication consists of 4 major aspects:
Inflatable Structures:
- Application of bike tube materials to increase the strength of inflatables
- Application of valve for better performance of maintain air pressure
- Application of outer skin for protection of inflatables
- Application of composite materials as inflatables frame
Air Pump System:
- Application of PVC tube for even distribution of air pressure
- Application of electrical pumping system
- Application of compressor for accurate air pressure supply
Pulley System:
- Application of pulley for flexible changing of stings profile
- Application of pulley motor support the pulley system
Control System:
RELATION OF PROJECT
Relation to other atom(s):
Relation to other project(s):
Relation to other developments on the site:
MATERIAL LIST for FABRICATION
Material list for 1 : 5 prototypes - phase II Material list for 1 : 1 prototypes - Phase III