project C:REALIZATION PLAN
(→REALIZATION PLAN) |
(→RELATION OF PROJECT) |
||
Line 46: | Line 46: | ||
'''Relation to other project(s): ''' | '''Relation to other project(s): ''' | ||
+ | [[project_E:Home|Interactive border]] as a possible furniture solution | ||
+ | [[project_G:Systems|Flexscape]] as a possible floor system | ||
Revision as of 10:02, 30 November 2011
REALIZATION PLAN
TECHNICAL IMPLEMENTATION
The architectural fabrication consists of 4 major aspects:
Inflatable Structures:
- Application of bike tube materials to increase the strength of inflatables
- Application of valve for better performance of maintain air pressure
- Application of outer skin for protection of inflatables
- Application of composite materials as inflatables frame
Air Pump System:
- Application of PVC tube for even distribution of air pressure
- Application of electrical pumping system
- Application of compressor for accurate air pressure supply
Pulley System:
- Application of pulley for flexible changing of stings profile
- Application of pulley motor support the pulley system
Control System:
RELATION OF PROJECT
Relation to other atom(s):
Relation to other project(s):
Interactive border as a possible furniture solution
Flexscape as a possible floor system
Relation to other developments on the site:
- Some of the strips would served as covered walkway for connecting the BK city to the Science center.
MATERIAL LIST for FABRICATION
Material list for 1 : 5 prototypes - phase II Material list for 1 : 1 prototypes - Phase III