project C:REALIZATION PLAN

From student
(Difference between revisions)
Jump to: navigation, search
(MATERIAL LIST for FABRICATION)
(REALIZATION PLAN)
Line 33: Line 33:
  
 
'''Control System: '''
 
'''Control System: '''
 
 
====Strip concept====
 
 
<gallery widths="145" heights="90" perrow="2" >
 
 
File:site-new.jpg
 
File:sketch02.jpg
 
 
</gallery>
 
 
<gallery widths="145" heights="90" perrow="2" >
 
 
File:sketch01.jpg
 
File:sketch03.jpg
 
 
</gallery>
 
 
 
====Path system concept====
 
 
The '''path system''' manages the path infrastructure on the site. It creates '''short-cuts through the site''' to the other surroundings and allows '''access to the activities''' in the site. The system has the following functionality:
 
 
'''- check if new activity is connected to a path '''
 
 
'''- if not then create a new path on the right patch of new activity '''
 
 
'''- if two activities are linking then merge activities and move path to the right of the rightmost activity'''
 
 
 
Path system logic scheme
 
 
[[File:path_chart.png|380px|left]]
 
 
 
Path system diagrams
 
 
<gallery widths="80" heights="50" perrow="3" >
 
 
file:path_1.jpg|
 
file:path_2.jpg|
 
file:path_3.jpg|
 
 
</gallery>
 
 
<gallery widths="80" heights="50" perrow="3" >
 
 
file:path_4.jpg
 
file:path_5.jpg
 
file:path_6.jpg
 
 
</gallery>
 
 
====Arch concept====
 
 
The arch shape is determined by a relation between the length of the space and the preferred height.
 
 
<gallery widths="80" heights="50" perrow="3" >
 
 
file:arch_1.jpg
 
file:arch_2.jpg
 
file:arch_3.jpg
 
 
</gallery>
 
 
===<span style="color:orange">VALIDATORS</span>===
 
 
====Future Users====
 
 
[[Project C:Future Users | read more >>]]
 
 
====Future Owner====
 
 
[[Project C:TU Delft drs Kuil |drs Ronald Kuil TU Delft Facility Management]]
 
 
====Future Partners====
 
  
 
</div>
 
</div>
Line 122: Line 46:
  
  
 
+
<div style="float: left; width: 780px; margin-right:10px; text-align:justify">
[[File:timeline.jpg |410px|right]]
+
  
 
===<span style="color:orange">REALIZATION TIMELINE</span>===
 
===<span style="color:orange">REALIZATION TIMELINE</span>===
 +
 +
[[File:timeline.jpg |780px|left]]

Revision as of 23:25, 28 November 2011

Contents

REALIZATION PLAN

TECHNICAL IMPLEMENTATION

The architectural fabrication consists of 4 major aspects:

Inflatable Structures:

- application of bike tube materials to increase the strength of inflatables

- application of valve for better performance of maintain air pressure

- application of outer skin for protection of inflatables

- application of composite materials as inflatables frame

Air Pump System:

- Application of PVC tube for even distribution of air pressure

- Application of electrical pumping system

- Application of compressor to accurate air pressure supply

Pulley System:

- Application of pulley for flexible changing of stings profile

- Application of pulley motor support the pulley system

Control System:

MATERIAL LIST for FABRICATION

Material list for 1 : 5 prototypes - phase II Material list for 1 : 1 prototypes - Phase III

1 to 5 Fribication material list.jpg
1 to 1 frabrication material list.jpg


REALIZATION TIMELINE

Timeline.jpg
Personal tools
Namespaces
Variants
Actions
Projects
Atoms
Toolbox