project C:REALIZATION PLAN
From student
Contents |
REALIZATION PLAN
TECHNICAL IMPLEMENTATION
The architectural fabrication consists of 4 major aspects:
Inflatable Structures:
- application of bike tube materials to increase the strength of inflatables
- application of valve for better performance of maintain air pressure
- application of outer skin for protection of inflatables
- application of composite materials as inflatables frame
Air Pump System:
- Application of PVC tube for even distribution of air pressure
- Application of electrical pumping system
- Application of compressor to accurate air pressure supply
Pulley System:
- Application of pulley for flexible changing of stings profile
- Application of pulley motor support the pulley system
Control System: