project C:REALIZATION PLAN

From student
Revision as of 22:00, 29 November 2011 by Lieke (Talk | contribs)
Jump to: navigation, search

go back to project page >>

REALIZATION PLAN

TECHNICAL IMPLEMENTATION

The architectural fabrication consists of 4 major aspects:

Inflatable Structures:

- application of bike tube materials to increase the strength of inflatables

- application of valve for better performance of maintain air pressure

- application of outer skin for protection of inflatables

- application of composite materials as inflatables frame

Air Pump System:

- Application of PVC tube for even distribution of air pressure

- Application of electrical pumping system

- Application of compressor to accurate air pressure supply

Pulley System:

- Application of pulley for flexible changing of stings profile

- Application of pulley motor support the pulley system

Control System:

MATERIAL LIST for FABRICATION

Material list for 1 : 5 prototypes - phase II Material list for 1 : 1 prototypes - Phase III

1 to 5 Fribication material list.jpg
1 to 1 frabrication material list.jpg

REALIZATION TIMELINE

Timeline.jpg

go back to project page >>

Personal tools
Namespaces
Variants
Actions
Projects
Atoms
Toolbox