REALIZATION PLAN

TECHNICAL IMPLEMENTATION

The architectural fabrication consists of 4 major aspects:


Inflatable Structures:

- Application of bike tube materials to increase the strength of inflatables

- Application of valve for better performance of maintain air pressure

- Application of outer skin for protection of inflatables

- Application of composite materials as inflatables frame

Air Pump System:

- Application of PVC tube for even distribution of air pressure

- Application of electrical pumping system

- Application of compressor for accurate air pressure supply

Pulley System:

- Application of pulley for flexible changing of stings profile

- Application of pulley motor support the pulley system

Control System:


RELATION OF PROJECT

Relation to other atom(s):


Relation to other project(s):

Interactive border as a possible furniture solution

Flexscape as a possible floor system


Relation to other developments on the site:

- Some of the strips would served as covered walkway for connecting the BK city to the Science center.

MATERIAL LIST for FABRICATION

Material list for 1 : 5 prototypes - phase II Material list for 1 : 1 prototypes - Phase III

1 to 5 Fribication material list.jpg
1 to 1 frabrication material list.jpg

REALIZATION TIMELINE

Timeline.jpg