project C:REALIZATION PLAN

From student
Revision as of 10:24, 30 November 2011 by Lieke (Talk | contribs)
Jump to: navigation, search

go back to project page >>

REALIZATION PLAN

TECHNICAL IMPLEMENTATION

The architectural fabrication consists of 4 major aspects:


Inflatable Structures:

- Application of bike tube materials to increase the strength of inflatables

- Application of valve for better performance of maintain air pressure

- Application of outer skin for protection of inflatables

- Application of composite materials as inflatables frame

Air Pump System:

- Application of PVC tube for even distribution of air pressure

- Application of electrical pumping system

- Application of compressor for accurate air pressure supply

Pulley System:

- Application of pulley for flexible changing of stings profile

- Application of pulley motor support the pulley system

Control System:


RELATION OF PROJECT

Relation to other atom(s):

Atom 8 is creating a structure that can incorporate many different activities but changes its appearences due to parameters related to (eg) sunlight, noise and user density. This could become an extension of the Spacebook structure system.


Relation to other project(s):

Interactive border is as a possible solution for Spacebook furniture

Flexscape is a possible system for a user adaptable floor


Relation to other developments on the site:

- Some of the strips would served as covered walkway for connecting the BK city to the Science center.

FINANCIAL REALIZATION

VALIDATORS

1. Questionnaire -> Shows interest and user demand. 2. Business economy student -> Possible financial solutions


MATERIAL LIST for FABRICATION

Material list for 1 : 5 prototypes - phase II Material list for 1 : 1 prototypes - Phase III

1 to 5 Fribication material list.jpg
1 to 1 frabrication material list.jpg

REALIZATION TIMELINE

Timeline.jpg

go back to project page >>

Personal tools
Namespaces
Variants
Actions
Projects
Atoms
Toolbox