project K:Design
From student
(Difference between revisions)
(→ELEMENTS/FRAGMENTS) |
|||
Line 29: | Line 29: | ||
<br> | <br> | ||
+ | <div style="float:left; width: 840px;"> | ||
==<span style="color:orange">MASTERPLAN</span>== | ==<span style="color:orange">MASTERPLAN</span>== | ||
+ | </div> | ||
[[File: Sez1.jpg | frameless | 960px]] | [[File: Sez1.jpg | frameless | 960px]] |
Revision as of 09:37, 22 November 2011
Contents |
PROJECT DESIGN
WHAT? WHERE?
The intervention forms an addition to the existing park. It integrates into the fabric and provides an activity zone between the Faculty of Architecture and the de Vries van Heijstplantsoen site. The intervention will take over what is currently a narrow parking corridor in an effort to add to the site with minimal modifications to the existing conditions.
ELEMENTS/FRAGMENTS
Text text text text text text text text text text text text text text text text text text text text text text text text text text text text text text text text text text text text text text text text text text text text text text text text text text text text text text text text text text text text text text text text text text text text text text text text text text text
MASTERPLAN