project F:Realisation-g
From student
(Difference between revisions)
(Created page with "<noinclude> {{navigation1-RealisationMain}} {{navigation1-RealisationSub}} </noinclude> =<span style="color:gray">Prototype evalutation</span>= == Material and construction chal...") |
(→Material and construction challenges) |
||
Line 7: | Line 7: | ||
== Material and construction challenges == | == Material and construction challenges == | ||
− | + | -Frabric: stretchability (1st ETFE not stretchable in the amount of time we needed to stretch it, then the stretchable fabric was too expensive), translucency/pattern to strech that type of fabric we needed a powerful compressor which we never got to get. In order to make the fabric airtight, the process required a certain type of machines which we impossible to do by ourselves. |
Revision as of 10:49, 31 January 2012
Design Realisation Relationships
Design Execution Prototype Validation Arduino development 1:1 Prototype
Prototype evalutation
Material and construction challenges
-Frabric: stretchability (1st ETFE not stretchable in the amount of time we needed to stretch it, then the stretchable fabric was too expensive), translucency/pattern to strech that type of fabric we needed a powerful compressor which we never got to get. In order to make the fabric airtight, the process required a certain type of machines which we impossible to do by ourselves.