project F:Realisation-g
From student
Design Realisation Relationships
Design Execution Prototype Validation Arduino development 1:1 Prototype
Final Model
Prototype underconstruction
Prototype evalutation
Material and construction challenges
-Cushions: stretchability of the fabric (1st ETFE not stretchable in the amount of time we needed to stretch it, then the stretchable fabric was too expensive. Indeed, the strechable fabric involved the use of translucency/pattern to strech that type of fabric we needed a powerful compressor which we never got to get. In order to make the fabric airtight, the process required a certain type of machines which we impossible to do by ourselves.
-Structure: