project I:Home

From student
(Difference between revisions)
Jump to: navigation, search
Line 22: Line 22:
 
=[[project_I:Site & Traffic Planning|Site & Traffic Planning]]=
 
=[[project_I:Site & Traffic Planning|Site & Traffic Planning]]=
 
[[File:The_Structure_1.jpg|325px|left|]]
 
[[File:The_Structure_1.jpg|325px|left|]]
Traffic Issues (Shared Space)
+
This section is mainly about how we solve the
 +
Traffic Issues by a creating a Shared Space;
  
Design is an architectural intervention
+
The master-plan and perspectives.
  
Design answers to concept challenge
 
 
Validation of design
 
 
Use case scenarios
 
 
Expert/client/user validation - by e.g. experiments and/or talks
 
 
</div>
 
</div>
 
<div style="float: left; width: 330px; margin-right:20px; text-align:left">
 
<div style="float: left; width: 330px; margin-right:20px; text-align:left">
 
=[[project_I:The Structure|The Structure]]=
 
=[[project_I:The Structure|The Structure]]=
 
[[File:The_Structure_2.jpg|325px|left|]]
 
[[File:The_Structure_2.jpg|325px|left|]]
Every thing about the structure.
+
Analysis of the BEAST:
 +
 
 +
how the BEAST answer the challenge, how it is generated and how it changes itself between multiple modes.  
  
  
Line 46: Line 42:
 
[[File:Realization_Plan.jpg|325px|left|]]
 
[[File:Realization_Plan.jpg|325px|left|]]
  
- Timeline of realization
+
Timeline of realization; Material and equipment list; Technical implementation; Validation of realisation plan, etc.
 
+
- Material and equipment list
+
 
+
- Technical implementation
+
 
+
 
+
Validation of realisation plan
+
 
+
- Proof by e.g. prototyping
+
  
- Expert/client validation
 
  
 
</div>
 
</div>

Revision as of 07:21, 1 December 2011

> Go to Atom09: Home

Contents

The Beast


Activate the Site-System by integrating it with the surroundings, and creating flexible space.

01.jpg
02.jpg
03.jpg
04.jpg
05.jpg

Site & Traffic Planning

The Structure 1.jpg

This section is mainly about how we solve the Traffic Issues by a creating a Shared Space;

The master-plan and perspectives.

The Structure

The Structure 2.jpg

Analysis of the BEAST:

how the BEAST answer the challenge, how it is generated and how it changes itself between multiple modes.


Realisation Plan

Realization Plan.jpg

Timeline of realization; Material and equipment list; Technical implementation; Validation of realisation plan, etc.





> Back to Atom09: Home
Personal tools
Namespaces
Variants
Actions
Projects
Atoms
Toolbox