project I:Home
From student
(Difference between revisions)
Line 22: | Line 22: | ||
=[[project_I:Site & Traffic Planning|Site & Traffic Planning]]= | =[[project_I:Site & Traffic Planning|Site & Traffic Planning]]= | ||
[[File:The_Structure_1.jpg|325px|left|]] | [[File:The_Structure_1.jpg|325px|left|]] | ||
− | Traffic Issues | + | This section is mainly about how we solve the |
+ | Traffic Issues by a creating a Shared Space; | ||
− | + | The master-plan and perspectives. | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
</div> | </div> | ||
<div style="float: left; width: 330px; margin-right:20px; text-align:left"> | <div style="float: left; width: 330px; margin-right:20px; text-align:left"> | ||
=[[project_I:The Structure|The Structure]]= | =[[project_I:The Structure|The Structure]]= | ||
[[File:The_Structure_2.jpg|325px|left|]] | [[File:The_Structure_2.jpg|325px|left|]] | ||
− | + | Analysis of the BEAST: | |
+ | |||
+ | how the BEAST answer the challenge, how it is generated and how it changes itself between multiple modes. | ||
Line 46: | Line 42: | ||
[[File:Realization_Plan.jpg|325px|left|]] | [[File:Realization_Plan.jpg|325px|left|]] | ||
− | + | Timeline of realization; Material and equipment list; Technical implementation; Validation of realisation plan, etc. | |
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | Validation of realisation plan | + | |
− | + | ||
− | + | ||
− | |||
</div> | </div> |
Revision as of 07:21, 1 December 2011
Contents |
The Beast
Activate the Site-System by integrating it with the surroundings, and creating flexible space.
Site & Traffic Planning
This section is mainly about how we solve the Traffic Issues by a creating a Shared Space;
The master-plan and perspectives.
The Structure
Analysis of the BEAST:
how the BEAST answer the challenge, how it is generated and how it changes itself between multiple modes.
Realisation Plan
Timeline of realization; Material and equipment list; Technical implementation; Validation of realisation plan, etc.