project I:Home
From student
(Difference between revisions)
Line 6: | Line 6: | ||
----------------------------------------------------------------------------------------------------- | ----------------------------------------------------------------------------------------------------- | ||
Activate the Site-System by integrating it with the surroundings, and creating flexible space. | Activate the Site-System by integrating it with the surroundings, and creating flexible space. | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
</div> | </div> |
Revision as of 15:25, 6 December 2011
Contents |
The Beast
Activate the Site-System by integrating it with the surroundings, and creating flexible space.
Site & Traffic Planning
This section is mainly about how we solve the Traffic Issues by a creating a Shared Space;
The master-plan and perspectives.
The Structure
Analysis of the BEAST:
how the BEAST answer the challenge, how it is generated and how it changes itself between multiple modes.
Realisation Plan
Timeline of realization; Material and equipment list; Technical implementation; Validation of realisation plan, etc.