project I:Home
From student
(Difference between revisions)
Line 16: | Line 16: | ||
=[[project_I:Site & Traffic Planning|Site & Traffic Planning]]= | =[[project_I:Site & Traffic Planning|Site & Traffic Planning]]= | ||
[[File:The_Structure_1.jpg|325px|left|]] | [[File:The_Structure_1.jpg|325px|left|]] | ||
− | This section is mainly about | + | This section is mainly about |
− | + | ||
− | + | the '''Answer to our Challenge''': | |
+ | |||
+ | <u>WHY</u> we change the traffic boundaries by a creating a Shared Space; | ||
+ | <u>HOW</u> we create a kinetic structure to make flexible space; | ||
+ | <u>INTENTION:</u> the master-plan and perspectives. | ||
</div> | </div> |
Revision as of 15:43, 6 December 2011
Contents |
The Beast
Activate the Site-System by integrating it with the surroundings, and creating flexible space.
Site & Traffic Planning
This section is mainly about
the Answer to our Challenge:
WHY we change the traffic boundaries by a creating a Shared Space; HOW we create a kinetic structure to make flexible space; INTENTION: the master-plan and perspectives.
The Structure
Analysis of the BEAST:
how the BEAST answer the challenge, how it is generated and how it changes itself between multiple modes.
Realisation Plan
Timeline of realization; Material and equipment list; Technical implementation; Validation of realisation plan, etc.